IN THE MATTER OF AN ARBITRATION
(AH 746)
BETWEEN
TEAMSTERS CANADA RAIL CONFERENCE
(the “Union”)
AND
CANADIAN PACIFIC RAILWAY
(the “Company”)
Re: Material Change: Calgary/Winnipeg Hump Closures (Adverse Effects)
ARBITRATOR: John M. Moreau QC
Appearing for The Union:
Ken Stuebing - Counsel, Caley Wray
Dave Fulton - General Chairman, CTY West
Greg Edwards - General Chaiman, LE West
Harvey Makoski - Senior Vice-General Chairman, LE West
Greg Lawrenson - Vice General Chairman, LE East
Doug Edward - Senior Vice General Chairman, CTY West
Appearing for The Company:
Lauren McGinley -Assistant Director, Labour Relations
David Pezzaniti -Assistant Director, Labour Relations
A virtual hearing was held on August 13, 2021.
A. PARTIES TO THE DISPUTE
-
The parties before the Arbitrator are the Canadian Pacific Railway Company (hereinafter
referred to as the “Company”) and the Teamsters Canada Rail Conference (hereinafter
referred to as the “Union”).
-
For further clarification, this brief is being presented on behalf of the Union’s two Western
GCA’s who represent the Union’s running trades members employed by the Company
throughout the region known as Western Canada (Thunder Bay west to British Columbia).
-
The dispute referred to the Arbitrator involves running trades employees governed by the
Collective Agreement between the Union and Company as well as the Canada Labour
Code.
B. JOINT STATEMENT OF ISSUE
-
On July 31, 2012, the Company issued a bulletin relating to the Calgary hump
transition. In the bulletin, the Company advised that regular updates will be
made available as the Company works through the process. On August 24, 2012,
the Company issued a bulletin (Update 2) which notified employees that the
Company expected to transition to full time flat switching by mid-September.
-
On August 16, 2012, the Company issued a bulletin advising that they intended
to decommission the North hump in Winnipeg, with an expected completion date
between September 10-14, 2012.
-
On September 3, 2012, the Company notified the Union that effective with crew
change September 9, 2012, the Company will cease hump operations at
Winnipeg, Manitoba. The Company stated that it did not anticipate a reduction in
2
yard crews at this time but the Car Retarder Operator positions would no longer
be needed and would be abolished in line with crew change on September 9, 2012.
-
The Union advanced grievances alleging violations of the material change
articles, asserting that the Company was required to provide proper notices of
material change and initiate negotiations with the General Chairmen to minimize
the significant adverse effects on employees resulting from the discontinuance
of humping operations at Calgary, AB and Winnipeg, MB. The Union reserved
the right to identify the adverse effects on employees during negotiations
between the parties.
-
The Company responded to the grievances acknowledging the changes and that
the work in question was reassigned to achieve greater efficiencies and does not
constitute a material change. Further, the Company did not feel these changes
fell under the description of “material change” nor did the Company feel that
it was the Company’s responsibility to make employees whole for the losses that
resulted from these changes.
-
The parties were unable to resolve the issue and agreed to have Arbitrator
Stout adjudicate the grievances.
-
On June 2, 2017, Arbitrator Stout heard the case and stated:
[46] I am of the view that the Union has clearly established a prima facie
case. The evidence submitted in these proceedings demonstrates that the
Company’s change, discontinuing hump operations and changing to flat
switching, had significant adverse effects. In this regard, I find that the
change constitutes a material change under the Collective Agreements.
[47] The Union’s evidence shows that several employees were materially
impacted in a negative way with respect to their employment and work
opportunities. The Utility and CRO positions were eliminated as a direct
result of the changes initiated by the Company. The Union points out that
several specific employees were displaced, transferred and laid off at least
partly because of the change. I am satisfied that, in addition to a
reduction in work opportunities, some of the layoffs at both Calgary (Alyth)
and Winnipeg are also directly related to the cessation of hump operations.
- Further, Arbitrator Stout concluded
3
[57] After carefully considering the submissions of the parties, I make
the following findings:
• The discontinuance of the hump operations in Calgary (Alyth) and
Winnipeg constitute a material change within the meaning of the
Collective Agreements.
• The Company violated the Collective Agreements by not issuing
notices of material change prior to discontinuing the hump operations
in Calgary (Alyth) and Winnipeg.
• The Union’s grievances are therefore allowed.
[58] In terms of orders, the Company is directed to issue the appropriate
notices of material change. The parties are directed to engage in the
material change process under the Collective Agreements.
-
On July 8, 2017, the Company issued Notice of Material Change for the closure
of the Calgary and Winnipeg hump operations and advised the Union that the
Company sees no measurable adverse effects related to the above-mentioned
closures.
-
The Company and Union have had several meetings as well as conference
calls to negotiate measures to minimize the significant adverse effects. On March
30, 2020, the Union provided a comprehensive list of assignments affected by the
change along with the dates and bulletins indicating the respective abolishments.
-
In accordance with the Collective Agreement Material Change provisions, the
parties met on January 8 and 15, 2021 for a Board of Review; however, the
Board of Review was unable to resolve the outstanding issues.
-
The outstanding issues are:
-
Confirmation of Adverse effects
• Union
o Arbitrator Stout has already determined employees were adversely
affected
o Res judicata – the Company cannot re-litigate the adverse effects
that was determined by Arbitrator Stout. The Company is bound
by the Arbitrator’s award and findings.
• Company
o Confirmation that adverse effects are limited to Car Retarder
Operator positions;
o Obiter dictum – Arbitrator Stout opined on adverse effects;
4
however, his comments cannot be taken as final determination as
this matter is at Arbitration under Article 110.07.
o Without prejudice or precedent to the foregoing, should adverse
effects be found by the Arbitrator, that measures to minimize these
adverse effects should not apply to adverse effects caused by other
changes including by not limited to implementation of RCLS at
Alyth/Winnipeg, operating change related to Winnipeg to Thief River
Falls, employees making seniority moves that result in bumping or
displacements and changes in traffic volumes.
-
Eligibility Requirements
• Union
o Eligibility is determined by the Material Change Article of the
Consolidated Collective Agreement
• Company –
o Eligibility for benefits to be subject to a 24-month cumulative
compensated service (CCS) requirement.
-
Maintenance of Basic Rates and/or lump sum payments
• Union
o Lump sum payment for affected employees that reflects a 5-year
MBR.
• Company
o Maximum 3-year duration
o Replication of other standard provisions (rest provisions)
-
Early Separation Allowances
• Union
o Consistent with 2016 RCLS agreement and previous CRO
agreements.
• Company
o Such benefits, if any, should only be provided if a surplus of
employees, directly attributable to these closures, is demonstrated.
For the purposes of demonstrating a surplus, the standards
established by the parties in the Vancouver RCLS material change
agreement from 1996 ought to apply.
-
Relocation Expenses
• Union
o As per the Consolidated Collective Agreement
5
• Company
o No application under the circumstances.
-
Severance Pay
• Union
o 20 years - $80k, 12 to 19; $75K, 8 to 11, $70K consistent with the 2016
RCLS agreement
• Company
o Such benefits, if any, should only be provided if a surplus of employees,
directly attributable to these closures, is demonstrated. For the purposes
of demonstrating a surplus, the standards established by the parties in
the Vancouver RCLS material change agreement from 1996 ought to
apply.
-
Lay-off Benefits
• Union
o Layoff protection as per the Consolidated Collective Agreement that
reflects a 5 year duration
• Company
o Maximum 3-year duration
o Replication of other standard provisions
-
Remedy
• Union – as prescribed by Arbitrator Stout:
o $2500 to each affected employee regardless of anything that is determined
by the material change agreement and/or arbitration to compensate for the
Company’s continual denial of any adverse effects.
o $20000 to each Union Divisions affected
• Company
o Objects to all requests for remedy as this was not requested in the
grievance procedure.
o Objects to all requests for remedy as such are not timely, contrary to the
sound principles of labour relations and the Company is unfairly prejudiced
based on the foregoing.
o The material change process is the remedy.
Union Position:
- The Union argues the Company has, to date, not provided a proper notice to the
Union with a full description thereof with appropriate details as to the
6
contemplated effects upon employees concerned. As such, there is no Company
description with appropriate details as to the contemplated effects upon
employees concerned to be provided to the Board of Review as required by the
Collective Agreement and by Arbitrator Stout.
-
On March 30, 2020, the Union provided a comprehensive list of assignments
affected by the change along with the dates and bulletins indicating the
respective abolishments. The Company is well aware of the adverse effects and
chooses to ignore them and their employees. Instead, the Company claims there
are no measurable adverse effects regardless of the grievance correspondence
and the Arbitrator Stout’s award.
-
The Company is barred from relitigating this point by the principle of res judicata.
The At paras 46-47, Mr. Stout plainly held that the Company’s change as
outlined by the Union had significant adverse effects on the employees affected
by the Company’s initiative.
-
Mr. Stout’s clear findings are binding on the parties. The purpose of the
instant proceeding is to quantify the impacts of the Company’s initiative on
the affected employees and ensure that sufficient terms are reached to offset
those adverse effects.
Company Position:
-
The Company maintains there were no measurable adverse effects related to
the above-mentioned closures. At no time, prior to December 2020, did the Union
make the Company aware of any objection to the sufficiency of the July 2017
Notice. Accordingly, the Company must submit the Union’s objections are not
timely. Without prejudice or precedent to the Company’s position that the notice
is proper, the Company is unfairly prejudiced by this untimely allegation in that
that Company did not have the ability to respond formally to the allegation and
was unable to review and, if necessary, issue any additional details. The
Company maintains this is inconsistent with the sound principles of labour
relations. Accordingly, the Company will object to any request by the Union for
remedial relief, including damages, based on this alleged breach.
7
-
In the event the Union’s request for remedial relief, including damages, extends
beyond their allegations pertaining to Notice, the Company must object as
this request is entirely without justification.
-
Regarding measures to minimize adverse effects, the Company maintains that
despite numerous discussions between the parties, the Union has failed to
identify which employees have, or may have been, adversely effected.
Regarding the Award of Arbitrator Stout, specifically paragraphs [46] and
[47], the Company submits the Union’s reliance mischaracterizes his findings.
Arbitrator Stout was acting as a rights arbitrator regarding determining if the
change in question constituted a material change under the provisions of the
Collective Agreement. While he commented on adverse effects, the Company
cannot agree this was properly before him and as such his comments cannot
be taken as final determination.
FOR THE UNION: FOR THE COMPANY:
Greg Edwards Lauren McGinley
General Chairman LE TCRC Assistant Director, Labour Relations
Dave Fulton
General Chairman
CTY TCRC
June 10, 2021
8
AWARD
INTRODUCTION
As noted in the Joint Statement of Issue, there are a number of outstanding issues
arising as a result of the transition in 2012 from the hump operations to flat switching in
both Calgary and Winnipeg.
Arbitrator Stout found in his decision of June 27, 2017 that the discontinuance of
hump operations amounted to a material change in working conditions and ordered the
Company to issue a Notice of Material Change pursuant to the collective agreement
requirements. Arbitrator Stout went on to find that certain employees were adversely
affected by the closure of hump operations and that the parties should engage in the
negotiation process mandated under the collective agreement in order to minimize the
adverse effects resulting from the material change to the hump operations.
The Company issued the Notice of Material Change on July 8, 2017, in compliance
with the direction of Arbitrator Stout. It took the position that there were no measurable
adverse effects related to the hump closures and that Arbitrator’s Stout’s comments were
simply his non-binding views on the Company’s initiative. The Board of Review that was
struck pursuant to the collective agreement as part of the material change process was
unfortunately unable to resolve the outstanding issues through mediation and have left
them for this arbitrator to decide pursuant to the jurisdiction conferred under s. 63.02 and
110.05 of the collective agreement. This is a challenging task given that the arbitrator is
being asked to look back to circumstances that existed almost 10 years ago.
9
ANALYSIS
Dealing with the issues as set out in the Joint Statement, my findings are as
follows:
Confirmation of Adverse Effects:
The Union takes the position that the findings set out in Arbitrator Stout’s award
of June 27, 2017 decision is subject to the equitable doctrines of res judicata, estoppel
and stare decisis, as noted in Brown and Beatty, Canadian Labour Arbitration at 2:3220:
2: 3220- Res judicata and issue estoppel
It is accepted by many arbitrators that the doctrine of res judicata and issue estoppel can
apply in labour arbitration, as can the doctrine of abuse of process. But because the
relationship of the parties to a collective agreement is a continuing one, and because the
same clause in the collective agreement may be the subject of interpretation and
application on successive occasions, the doctrine has been qualified to some extent. So
unless the collective agreement expressly provides that an arbitration decision binds the
employer in future cases involving identical circumstances, the prevailing view is that the
doctrine of res judicata does not apply, nor is the arbitrator strictly bound by a prior award
as to the construction of the agreement. Rather, it is said that the prior award should be
followed as a matter of principle unless the arbitrator has a clear conviction that the earlier
interpretation is wrong.
(emphasis added)
Although I am not strictly bound by the decision of Arbitrator Stout, I agree with the
the Union’s submission that his findings should be adopted “as matter of principle”,
following the common law doctrine of res judicata. Those findings were based on the
extensive evidence and submissions that were presented to him at the hearing on June
2, 2017 and which is substantially the same evidence which has been presented once
again before me. I find his comments to be persuasive in my review of the adverse effects
of the hump closures in Calgary and Winnipeg based on the principles set out in the
10
Brown and Beatty text. Arbitrator Stout concluded in the Decision portion of his award
that “several specific employees” were impacted by the closures. He states at para 47:
The Union’s evidence shows that several employees were materially impacted in a
negative way with respect to their employment and work opportunities. The Utility and
CRO positions were eliminated as a direct result of the changes initiated by the Company.
The Union points out that several specific employees were displaced, transferred and laid
off at least partly because of the change. I am satisfied that, in addition to a reduction in
work opportunities, some of the layoffs at both Calgary (Alyth) and Winnipeg are also
directly related to the hump operations.
The list of those “specific employees” who were “materially impacted in a negative
way”, according to Arbitrator Stout, is found at paragraphs 30 and 33 of his award:
[30] The Union provided specific examples of Calgary employees who they insist were
adversely affected by the elimination of the hump yard operations in Calgary. Those
specific employees are as follows:
• Pete Cigui was a set up Locomotive Engineer prior to the change and later became
a Trainman on a switcher.
• Aaron Wood was a set up Locomotive Engineer in the pool prior to the change and
later became a Conductor in the pool.
• Stanley McLellan was a set up Locomotive Engineer in the pool prior to the change
and later became a trainman on the spareboard.
• Chris Shuttleworth was a Conductor in the pool prior to the change and later
became a trainman on the spareboard.
• Sean Hicks was Conductor in the pool prior to the change and later moved to the
yard spareboard.
• Paul McKinnon was working a regular yard position prior to the change and later
moved to the yard spareboard.
• Ryan Dorr was working a pool position prior to the change and later was laid off as
a Conductor.
• Tim Whelan was a junior employee who was laid off.
[33] The Union provided specific examples of Winnipeg employees who they insist
were adversely affected by the elimination of hum operations in Winnipeg. Those specific
examples are as follows:
11
• Between April 1, 2021 and April 1, 2013 there were three Locomotive Engineers
lost to attrition and three others lost their position.
• Brian Green a car retarder was accommodated as a CRO prior to the change, but
retired when he lost his CRO position.
• Charlie Brow and John Ladd, also retired after losing their CRO positions.
• Mat Morrisey and Dave Gregory lost their CRO positions and went to yard
positions.
• Sean Keir and Wes Geiler went from Conductor positions in the pool prior to the
change to a Trainmen on the spareboard.
• Jacob Laye and Maurice Showers went from working regular yard positions prior
to the change to being laid off.
It is significant in my view that in addition to the above name individuals, Arbitrator
Stout had before him the same statistical information, including numerous flow-charts,
which was also provided to this arbitrator with respect to the Union’s submission regarding
what the Union terms as the “cascading adverse effects” on the Winnipeg and Calgary
employees.
In keeping with the principle of acceptance of the findings of the previous arbitrator
on the same facts, I am in agreement with the Company’s position that Arbitrator Stout
considered the submissions of the Union on the impact of the hump closures and limited
his findings to the specifically named employees set out in the Union’s brief as being
directly affected by the hump closures. As the Company points out in its reply submission,
the use of the word “several specific employees” (para 47) runs counter to the Union’s
submission of the “vast impact” and “cascading effect” on the numerous positions that
were directly affected by the hump closures.
12
In the end, I agree with the Company that the Union’s submission of the extensive
adverse effect on the ranks of employees far exceeds the findings of Arbitrator Stout. Had
Arbitrator Stout found there to be other positions that were adversely affected by the hump
closures, he would have so indicated in his findings.
I find no principled basis to disturb the findings of Arbitrator Stout in regards to
those named individuals who were directly related to the closure of the hump operations.
There shall be no further benefits available to employees as a result of the hump closures
other than those named above in paragraphs 30 and 33 of the Stout award.
Eligibility Requirements:
The Company submits that, dating back decades, the parties have agreed that
employees with less than 2 years of cumulative compensated service (“CCS”) would not
be entitled to benefits. For the purposes of replication, which the Company submits is a
core principle which should be adhered to in these proceedings, the Company argues
that I should rely upon the 2007 material change provisions and the relevant historic
material change agreements. In that regard, the Company submits, by way of example of
the numerous agreements reached between the parties, the following: Expedited Service
Runs (“ESR”) Memorandum of Agreements March 7, 2013 (ESR Kenora to Thunder Bay)
and September 10, 2013 (ESR Toronto, London, Buffalo). The Company also notes that
the 2016 Remote Control Locomotive Systems (“RCLS”) Agreement, which the Union
proposes for consideration, required at least two years of CCS for benefits eligibility.
Further, on the matter of the accepted 2 years CCS minimum, the Company cites Arbitrator Picher
in Ad Hoc 353 E:
13
The next point in dispute concerns whether, as the Company proposes, the agreement
should be restricted to employees with two or more years of cumulative compensated
service, a proposition contested by the Council. It does not appear disputed that that
restriction is common in job security and employment security agreements within the
railway industry, and has been for decades. It has, further, been incorporated into
arbitration awards, including the 1989 and 1990 belt-pack awards issued in relation to
hump yard operations. In the arbitrator’s view, the position of the Company in respect of
this issue is reasonable, and should be awarded.
The Union, for its part, noted in its brief at paragraph 124 that the parties have not
expressly provided for the two years CSS in general applicable terms:
As it was clear to Mr. Stout, there is no general two-year eligibility threshold in the
Collective Agreement-such eligibility threshold must only be applied where the parties
have expressly deemed it appropriate (e.g. relocation expenses and early separation).
Although there is a lengthy history of the application of the two-year CCS
requirement, Arbitrator Stout in his Award elected to follow the principle of expressio unius
exclusio alterius set out in Cambrian College of Applied Arts and Technology v. Ontario
Public Service Employees Union [unreported, Bendal, May 2005] an authority provided
by the Union, at p. 8:
On the basis of the principle of interpretation expressio unius exclusio alterius, we have
every reason to doubt the parties ever intended bereavement leave to replace vacation
leave in the circumstances revealed in this case. Why, one must ask, did they spell out
that vacation leave is to be rescheduled in the event of hospitalization, yet remain silent
on the consequences of a death in the family during vacation leave? The only satisfactory
answer to this question is that they did not intend that bereaved employees should have
the right to reschedule vacation leave.
Arbitrator Stout made a similar finding beginning at paragraph 48:
[48] I disagree with the Company’s assertion that the material change provisions do not
apply to situations involving employees with less than two years CCS. There is no doubt
that some of the benefits, such as relocation expenses in 34.11-LE and 72.14-CTY, will
not be granted to employees with less than two years CCS. However, the parties have not
14
used such qualifying language to trigger the general application of the material change
provisions to articles 72.01 CTY and 34.01 LE
[49] Quite frankly, it only makes sense that certain employees would be limited in the
benefits that they might receive due to the adverse effects of a material change. Just as
job security accumulates with seniority, so too would benefits that apply to those adversely
affected senior employees.
Adhering to the principle of res judicata as it is applicable in these types of
proceedings, I accept the reasoning of Arbitrator Stout with respect to employees with
less than two years of service. As noted in the Brown and Beatty excerpt above, I have
no clear conviction that his interpretation of the collective agreement is manifestly wrong.
Accordingly, I find that the eligibility for benefits, unless specified otherwise in the current
collective agreement, is not subject to a 24-month CCS as proposed by the Company.
Maintenance of Basic Rates
For the reasons set out above, and in the absence of specific language indicating
otherwise for MBR in the collective agreement, eligibility for MBR shall not be subject to
a 24-month CCS as proposed by the Company.
The Company proposes that the MBR should only extend for a maximum 3-year
duration and cites in support for replication purposes the March 7, 2013, Kenora to
Thunder Bay Memorandum of Agreement. The Company also seeks replication of the
provisions found in that Memorandum of Agreement, including the standard provision
which deals in particular with rest periods. In addition, the Company notes a similar
agreement was reached containing a 3-year provision in the May 2, 2019 ESR Coquitlam,
Roberts Banks and Kamloops Memorandum of Agreement. The Union proposes a 5-year
wage protection period for maintenance of earnings.
15
Bearing in mind the duplication principle found in the interest arbitration process, I
am persuaded that the terms of the 2003 Memorandum of Agreement with respect to the
elimination of the 4 CRO positions in the South Hump of the yard in Winnipeg is the most
appropriate and the closest comparator for purposes of fixing the MBR. In that case the
parties were able to negotiate a lump sum of $9000.00 per employee.
Although this $9000.00 figure is dated given that the closure took place some 18
years ago, it fits within what I find is a close and reasonable comparator for those
employees who were adversely affected in the same way as the closure of the north hump
in Winnipeg and the Alyth yard in Calgary. It also fits within the calculations provided by
the Union for a 5-year MBR when comparing, for example, the difference between an
RCLS foreman (YSE) to a Yard Foreman over the course of 5 years from 2012 to 2017.
I also accept the Union’s rationale that the rest provisions and the other standard
conditions found in the March 7, 2013 Kenora and other agreements should not be
retroactively applied given the passage of time.
Accordingly, employees from the list set out in Arbitrator’s Stout’s June 27, 2017
award who would have qualified for MBR shall receive $9,000.00 each.
Early Separation Allowances
The Union submits that given the material change and the proven adverse effects
due to the hump closures, the number of early retirement opportunities should be the
agreed upon formula for the positions lost as determined by Arbitrator Stout. The Union
suggests that the proper formula to use for these purposes is found in prior comparable
16
negotiated material change agreements, including the 2016 RCLS agreement and CRO
agreements.
The Company maintains that the Union has not met its burden to establish that a
reduction of work associated with the humps created a surplus of eligible employees. The
Company submits that the Union has offered no fact-based proof of a surplus of
employees directly attributable to the material change of the hump closures. The
Company points to the fact that numerous changes such as the introduction of longer
trains and the use of other yards to switch trains (Calgary), for example, contributed to
manpower reductions during the closure period.
With respect, I disagree with the Company. In my view, that matter was dealt with
by Arbitrator Stout when he determined the specific employees who were adversely
affected by the hump closures as a result of the abolishment of their positions.
I agree with the Union that the only remaining question is whether the agreed upon
formula set out in the current collective agreement should be adopted here. The Union
notes that the parties negotiated 4 separation allowance and severance payment
opportunities as early as the 2003 Winnipeg CRO Agreement. The more recent 2016
RCLS agreement dealt with the elimination of assigned yard positions. The parties
negotiated the following formula in the 2016 RCLS agreement:
8.1 The early separation plan as outlined herein will be made available to employees who
have more than 2 years CCS at the time of implementation and have worked continuously
at the affected terminal or outpost terminal for at least one year as a bargaining unit
employee immediately prior to the date of acceptance of early separation. This one year
requirement may be waived by the General Chairs.
8.2 The number of attrition opportunities available, consisting of early separation
allowances and severances, will be equal to the number of assignments reduced
multiplied by 1.25. Fifty percent of the opportunities that become available will be
17
bulletined not later than January 31 of the year following implementation. These will be
awarded to Locomotive Engineers only. Should these opportunities not be taken in a given
year, they will be banked and re-bulletined each year for Locomotive Engineers only, until
exhausted.
As noted by the Union, this benefit formula has been adopted and applied more
broadly to include the current CTY agreement. In 2016, the same formula set out in 8.2
above was adopted by Arbitrator Schmidt in AH 641, a decision issued on September 21,
- As noted, it is now incorporated in the material change provisions of the collective
agreement.
The Company’s hump closures in 2017 (similar to the RCLS closures in Winnipeg
a year earlier in 2016) resulted in the elimination of assigned yard positions at both the
Calgary and Winnipeg locations. It is my view, subject to the requirement specified in the
collective agreement of 2 years of CCS, that the same formula set out in the 2016 RCLS
Agreement and referred to in AH 641 should be applied here.
Accordingly, the number of the early retirement benefits to be made available to
those eligible employees from the list set out in the June 27, 2017 Stout award will be
calculated using the same formula set out in the current collective agreement of 50% of
the number of assignments multiplied by 1.25.
Relocation Expenses
Arbitrator Stout notes at paragraph 48 of his award that the two-year CCS rule
applies to affected employees seeking relocation expenses:
There is no doubt that some of the benefits, such as relocation expenses in 34.11-LE and
72.14 CTY, will not be granted to employees with less than two years CCS.
18
The Company maintains that no lay-offs occurred of employees with the minimum
of 2 years of CCS at either the Calgary or Winnipeg locations. Accordingly, the Company
maintains that no relocation benefits are owing under the circumstances.
The Union properly submits in my view that any employee who meets the 2-year
CCS requirement, and are found to have relocated following the closure of the two hump
sites, should be entitled to claim relocation expenses. Their relocation must be a direct
result and contemporaneous with the closure of the two humps sites in order to qualify
for retroactive relocation expense reimbursement.
Severance Pay
The Company maintains that, in addition to the eligibility requirement of 2 years
CCS, any severance can only be considered if a surplus of employees, directly
attributable to the closures is demonstrated. The Company notes that none of the
employees who were laid off for any period of time had greater than 2 years CCS nor has
a surplus of employees directly attributable to these closures been demonstrated.
The Union maintains in its brief that the Company’s position is “both impractical
and contrary to the spirit of this exercise undertaken to minimize adverse effects to require
a surplus out of [the] gate”.
The Union submits and I agree that the measures to minimize the adverse effects
are analogous to the 2016 RCLS agreement. In that regard, it is also appropriate in my
view to follow the formula of Arbitrator Schmidt in her September 16, 2016 AH 641 at p.
23:
19
In light of the above, I accept the Union’s proposal that the number of the early retirement
benefits it urges be made available is appropriate and consistent with the actual
assignments reduced with a relief factor of 1.25 as per the replication of the RCLS
agreements. These benefits will accelerate the retirement of senior employees and
thereby favour the retention of junior employees. As for severance opportunities, I think it
appropriate to make such opportunities available to employees in any given location if
after any pay out of early retirement benefits there is a surplus of employees. The standard
for a surplus to be established is where an employee(s) is required to be laid off for nine
out of 12 months. It may be that no surplus will arise, but if one does emerge, payments
are to be made available as found in the RCLS agreements. (emphasis added)
I note that the 2016 RCLS agreement also adopts the following language for the
establishment of a surplus:
9.15 The standard for a surplus to be established is where an employee(s) is laid off for
nine (9) out of 12 months.
Given the interest arbitration nature of these proceedings, I also find that the
appropriate severance formula to be the one set out in the 2016 RCLS agreement:
a) 20 years or more cumulative compensated service: $80,000
b) 12 to 19 years, inclusive, cumulative compensated service: $75,000
c) 8 to 11 years, inclusive, cumulative compensated service: $70,000
Accordingly, any employee from the list of employees named in the Stout award of
June 27, 2017 shall be entitled to severance pay should they meet the qualification and
eligibility requirements provided herein.
Lay-off Benefits
The Company maintins that, in addition to the eligibility requirement of 2 years
CSS, any layoff benefit should continue for a maximum of 3 years, as set out in the March
7, 2013 ESR Kenora to Thunder Bay Memorandum of Agreement.
20
The Union submits that the 3-year duration is arbitrary, particularly in light of the
scale of material change involving the two hump closures. Further the Union submits that
the current layoff benefit language in the collective agreement does not contain an
express term that two years of CCS is required. The Union points out in that regard the
supporting comments of Arbitrator Stout in his award (paragraph 48) where he notes that
the parties have not used such qualifying language in the layoff protection clause in the
current collective agreement.
In keeping with the reasoning of Arbitrator Stout, and in the absence of any
provision in the Layoff Protection article stating something different, I find that the two-
year CCS limitation should not be applied to those named employees in the above list
who would otherwise be eligible for layoff protection.
Nor do I find a basis to limit the lay off benefit to 3 years, as proposed by the
Company. The 2016 RCLS agreement, from my reading, also does not limit the duration
of the layoff benefit. I also note the comments of Arbitrator Schmidt at p. 17 where she
states:
In the circumstances, the Union’s proposal, which replicates the RCLS Agreements, is to
be preferred over the Company’s. Further, I see no rationale for disqualifying employees
who do not own positions from access to layoff protection. Finally, since the entitlement to
protection resides with the employee affected by the implementation of the material
change, there is no rational basis to limit the duration of the entitlement. (emphasis added)
Accordingly, eligible employees named in the list set out by Arbitrator Stout shall
be entitled to layoff protection without the 3-year limited duration proposed by the
Company and shall not be subject to a minimum requirement of two years CCS.
21
Remedy
I do have some sympathy for the Union and the fact that some of the named
adversely affected employees should have had the benefit of a timely material change
agreement.
However, in the interests of labour relations and respecting the elaborate
provisions set out in the collective agreement involving the material change process, I am
not disposed to award the damages requested by the Union. That would in my view not
be adhering to the principle and spirit of replication which the parties have asked me to
undertake in this matter.
CONCLUSION
This matter is remitted back to the parties in order that they can draft the
appropriate language based on the above findings. As requested, I will remain seized of
any issues that may arise between the parties from this matter.
JOHN M. MOREAU, Q.C.
October 12, 2021